DL headcount sizing_Rev0.1

发布时间:   来源:文档文库   
字号:


Approver(SHHYeo
DistributionListRevRev0.1

DLheadcount&stationsizingcookbook
Revision
Rev0.1
ReleasedDate
11/07/08
DesignationGOSIEDirectorDateofApproval11/07/08
GlobalIEManager,SiteFunctionalIEmanager

ChangeDetailsInitialRelease
Date
11/07/08

Originator(sSheTeeTan

1.Purpose


Thiscookbookwillintroduceamethodologyforanalyzing,assessingandcalculatingtheDLandstationrequirementforthemechanicalassemblyoperation.

2.Scope

Intoday’scompetitiveenvironment,customersdemandeverythingbetter,fasterandcheaper.Toremain
competitiveJabilmustcontinuetoimprovetheirmanufacturingprocessesandoperation.OneofthekeyfocusareainmanufacturingoperationistheDLoptimization.It’sthetaskofIndustrialEngineersandtheManufacturingtoidentifyopportunitiesandcontinuousdrivingoptimizationinthisarea.
Inthesubsequentsectionoftheprocedure,we’lldiscusstheapplicationofthetemplateandhowit’susedtocompute#ofDLandstationrequirement.
3.Definitions/Terminology

TAKT-Therateofcustomerdemand,calculatedbydividingtheavailableproductiontimebythequantityMOST-MaynardOperationSequenceTechniquePFDpersonal,fatigueanddelay
Standardtime-isthetimerequiredbyanaverageskilledoperator,workingatnormalpacetoperformthetaskusingaprescribedmethod,allowingtimeforPFDOLEOveralllaborefficiency


JabilProprietaryandConfidentialAllrightsreservedPrintedcopiesarereferenceonly
Page1of4



4.Responsibility
4.1

DLheadcount&stationsizingcookbook
Revision
Rev0.1
ReleasedDate
11/07/08
ItistheresponsibilityofMEor/andIEtoupdatetheassumptions,standardtime,demandtoanalyzetheDLandthestationrequirementwheneverthere’rechangesinanyofthevariables.

5.Documents
5.1
Referencedocuments5.1.1
DLandstationsizingtemplate
6.Process
6.1

Sizinginputsandprocesssteps
3.Standardtime
2.Assumptions
4.Customerdemand
1.Processmatrix
5.DLandStationsizingtemplate
6.Datasharingwith
Workcell
7.QuarterlyDLforecastsizing
8.OLE%monitoringandcontinuousimprovement


Input:Processmatrix

6.1.1
ProcessmatrixwiththeassemblysequencestartingfromstationafterSMTuntilpackingwillneedtobeincludedinthetemplate.Thisincludesthemainassembly,sub-assemblyandthecomboprocess.Offlineactivitiessuchasrework/debug,materialhandling,RMAandotherofflineprocessarenotmandatoryforthissizing.(TemplatecanbeusedfortheofflineDLrequirementestimationifthestandardtimeisavailable


JabilProprietaryandConfidentialAllrightsreservedPrintedcopiesarereferenceonly
Page2of4




6.1.2

DLheadcount&stationsizingcookbook
Revision
Rev0.1
ReleasedDate
11/07/08
Input:Assumptions
#ofshift/day
Productivehr/shift
PFD(personalfatigueanddelayYield
Input:Standardtime
TheworkmeasurementtechniquesthatnormallyusedinJabil:

MOSTJabilstandardtooltoestablishthetimestandard,applicabletoallmanualoperation
TimeStudyestablishtimestandardformachinetime,testtimeandinspectiontime
6.1.3

6.1.46.1.5

6.1.6
6.1.7
6.1.8
Input:Customerdemand
Customerdemandshallbeobtainedfromtheplanner,intheformofMPS.

DLandStationsizingtemplate
Afterallvariablesandassumptionsareinsertedintothetemplate,theoutputwillbepresentedasbelow
Requirementstotal#ofrequirementthatgothroughtheprocessinaday,itwillbe
usedtocomputetheTAKToftheprocess
TAKTinsec,calculatedbydividingtheavailabletime/daytotheRequirements
Weightedtimecomputedbytakingtheweightedaverageofthestationstandardtime
andtherequirementthatgothroughtheprocess
#ofmachineorstationandDLrequirementWeightedtimedividedbytheTAKTtimeRoundupthisistheroundupoftherequirement.Roundupwillberequiredforthe
station/machinebutnotnecessaryontheDL.ThefractionofDLrequirementwillindicateanopportunityofprocessmergingandlaborflexingtoupstreamordownstreamstation.
Datapublishing
Theoutputoftherequirementwillthenbesharedwiththeworkcellfunctionalteam.Finalbuyofffromworkcellmanagerisrequired.
MPCDLforecast
The#ofDL(manualoperationincludingtheSMT,offlineheadswillthenbeusedfortheMPCDLforecast.
OLE%monitoring&continuousimprovement
OveralllaborefficiencyisanindicatortotellhowefficiencytheDLsarestaffedvs.theactualrequirement.Thechallengeofmaintainingtheindicatoratthecompetitivelevel(eg:>85%willbethedemandfluctuation,changesinmix,soit’skeytohaveDLcrosstrainedtoenablemobilizationwithintheorganization.

7.0Records



JabilProprietaryandConfidentialAllrightsreservedPrintedcopiesarereferenceonly
Page3of4



7.1
DLheadcount&stationsizingcookbook
Revision
Rev0.1
ReleasedDate
11/07/08
Eachworkcellshallhavethesizingmodelupdatedperiodicallyuponchangesonkeyassumptionsorcustomerdemand.




JabilProprietaryandConfidentialAllrightsreservedPrintedcopiesarereferenceonly
Page4of4